Staffing

Staffing Trigger Point

See whether your current crew utilization has crossed the point where a new hire is cheaper per billable hour than running overtime.

Hire now$5.42 / hour gap (overtime - new hire)
Overtime cost / billable hour$48.75
New hire cost / billable hour$43.33
How we got here
  1. Overtime cost / hour = rate × multiplier = $32.5 × 1.5 = $48.75
  2. New hire cost / billable hour = annual cost / (hours × utilization) = $65,000 / (2000 × 75%) = $43.33
  3. Utilization is above the 90% structural-overtime threshold.

Shared fields save automatically as you edit them. Review or edit everything in one place in your Business Profile, so every engine starts pre-filled.

Next Decision

Based on your results, these related decisions are available.

Want to Learn More?

Methodology

Formula: overtime cost per billable hour = loaded rate × overtime multiplier. New-hire cost per billable hour = new hire's annual cost / (standard hours × expected utilization). The recommendation combines this cost comparison with whether current utilization is above a structural-overtime threshold.

Assumption: the 90% structural-overtime threshold is a commonly cited rule of thumb, above which overtime tends to become routine rather than occasional. It is editable, not universal math.

Limitation: this is a triage/threshold engine, not a detailed crossover calculation. Once it points toward hiring, run Hire vs. Overtime / Second Crew Break-Even for the hours-based crossover on your specific demand spike.