Management Span of Control Cost

See what each crew under a manager costs in supervision overhead, and whether their span of control is overextended or has room for more.

In range$18,750 / crew (66.7% of max span)
Cost per crew at +1 crew$15,000
Savings per crew from +1$3,750

Shared fields save automatically as you edit them. Review or edit everything in one place in your Business Profile, so every engine starts pre-filled.

Next Decision

Based on your results, these related decisions are available.

Methodology

Formula: cost per crew supervised = manager cost / crews supervised. Span utilization = crews supervised / recommended max span.

Assumption: the recommended max span (default 6) is a commonly cited rule of thumb for field-service management span of control, not a hard limit.

Limitation: this measures cost and headcount only, not supervision quality or crew complexity differences.